How Long Does a Bathroom Remodel Take in Bellevue?
If you’re planning a bathroom remodel in Bellevue, youβre probably asking one important question: how long will it take? Whether youβre giving your powder room a fresh look or gutting the master bath for a luxury upgrade, understanding the remodeling timeline helps set realistic expectations and avoid surprises along the way.
At Evergreen Bathroom Remodelers, weβve completed hundreds of bathroom projects across Bellevue, Renton, and Seattle over the past 12 years. In this post, weβll walk you through what affects remodeling timelines, how long different types of bathroom projects typically take, and how to avoid delays in your own renovation.

Why Understanding Bathroom Remodel Timelines Matters
homeowners, itβs the only full bath in the house. Thatβs why knowing how long your remodel will take is crucial to planning where youβll stay, how to coordinate with contractors, and how to manage your expectations.
From permits to plumbing, every step plays a role. And while online estimates may say βtwo weeks,β the reality especially here in King County is more nuanced. Letβs break it down.

Average Bathroom Remodel Time in Bellevue (2025 Update)
The time it takes to remodel a bathroom in Bellevue depends on the scope of the project. Here’s what we typically see:
Project Scope | Estimated Timeframe |
Cosmetic Update | 2β3 weeks |
Full Standard Remodel | 4β6 weeks |
High-End or Custom Remodel | 6β8+ weeks |
These timelines are based on real-world averages from Bellevue remodeling projects, not just ideal scenarios.
- Cosmetic Remodels (2β3 weeks): New paint, lighting, vanity, and hardware with no plumbing or layout changes.
- Standard Remodels (4β6 weeks): Includes replacing tile, tub/shower units, toilets, vanities, flooring, and some electrical or plumbing adjustments.
Major Remodels (6β8+ weeks): Structural changes, moving plumbing lines, custom cabinetry, heated floors, or luxury features like steam showers or built-in sound systems.

Key Phases of a Bathroom Remodel and Time Required
Hereβs a breakdown of each major phase in the remodeling process:
1. Planning & Design (1β3 weeks)
This phase includes design consultations, 3D renderings, layout planning, fixture selections, and obtaining necessary city permits. In Bellevue, permits may take 5β10 business days to approve, especially if plumbing or structural work is involved.
2. Demolition (2β5 days)
The existing tile, cabinetry, flooring, and fixtures are removed. If hidden issues like water damage or mold are discovered common in older Bellevue homes this phase could extend by a few days.
3. Rough-In Work (1β2 weeks)
Licensed electricians and plumbers update wiring and pipes to fit your new layout. This step also includes inspection scheduling with the city or county, which may cause slight delays.
4. Installation (2β3 weeks)
Tile, flooring, vanities, bathtubs or showers, lighting, and trim are installed. Custom tile or cabinetry may extend this timeline depending on material delivery.
5. Finishing Touches & Final Inspection (1 week)
Painting, accessories (mirrors, towel bars), and clean-up happen here. If you’re in Bellevue, King County inspectors may need to do a final walkthrough before sign-off.

Local Factors That Affect Bathroom Remodel Time in Bellevue
Permit and Inspection Scheduling
Permits from the City of Bellevue for bathroom remodels especially those involving electrical or plumbing must be submitted through MyBuildingPermit.com. Most permits are issued in under 10 business days, but if thereβs a high volume of applications, it can take longer.
City inspections can also add a few days between rough-in and final sign-off, especially in peak seasons like spring or fall.
Material Lead Times
Tile fixtures, and specialty products (e.g., frameless glass showers or imported vanities) can delay construction if they arenβt ordered early. We advise Bellevue homeowners to finalize selections before the demo begins.
Scope Changes Mid-Project
One of the biggest timeline killers? Changing your mind after work has started. If you decide to upgrade tile or reroute plumbing during construction, expect delays and cost increases.

Real Project Example: Remodel Timeline in Action
Project: 5×8 Hall Bathroom Remodel in Bellevueβs Eastgate Neighborhood
Goal: Replace tub with walk-in shower, new tile, vanity, flooring
Duration: 5.5 weeks total
- Week 1: Design finalized and permits submitted
- Week 2: Permits approved, demo begins
- Week 3: Rough plumbing and electrical updates
- Week 4β5: Tile, paint, shower glass, and fixtures installed
- Week 6: Final touch-ups and Bellevue city inspection
Result: The project stayed on budget and finished only two days behind the original schedule mainly due to a delayed tile shipment.
Timeline Recap: Checklist for Homeowners
β
Finalize layout and product selections early
β
Schedule permits through MyBuildingPermit.com ASAP
β
Confirm start date and project phases with your contractor
β
Budget extra time for shipping delays or inspection windows
β
Prepare for minor surprises especially in older homes
Ready to Remodel Your Bellevue Bathroom?
At Evergreen Bathroom Remodelers, we donβt just deliver beautiful bathrooms we deliver them on time. We guide you through design, permitting, demolition, and installation with complete transparency. Our team has remodeled over 300 bathrooms across Bellevue, Renton, and Seattle with a 95% on-schedule completion rate.
π Book a free in-home consultation to get your personalized bathroom remodel timeline and quote.
Your perfect bathroom is just a few weeks away letβs build it right.